As a part of curriculam an industrial visit to KTPP, Thermal power station (stage-I 500 MW), Ghanpur, Warangal district, Telangana was organized on 26/11/2022. Around 60 B.E EEE students from 3rd and 4th year along with 4 faculty members took part in the visit. This power plant was developed in 2 stages. The first stage comprised one 500MW unit. The unit was synchronized to grid with oil firing on 31.03.2010 at 06:08 hrs. Coal firing was immediately taken up and the load was raised up to 84 MW and the unit was in service with this load for about 1 hour.Kakatiya TPP Unit-II 1X600MW, was synchronized to the grid at 03:00 hrs. on 22 October 2015 and loaded to 105 MW.